Slewing Trolley Control Panel Box For Tower Crane
- ZCJJ
- China
- store
- 10sets
Ha Noi Tower crane Can Tho Tower crane
Ho Chi Minh City Tower crane
Thành phố Hải Phòng Tower crane
Products Specification
Slewing Trolley Control Panel Box For Tower Crane
Tower Crane Slewing Control Panel Box Invertor
Tower Crane Trolley Control Panel Box Invertor
Tower Crane HF PANEL BOX
etc.
Slewing Trolley Control Panel Box For Tower Crane
Tower Crane Slewing Control Panel Box Invertor
Tower Crane Trolley Control Panel Box Invertor
Tower Crane HF PANEL BOX
Tower Crane Knowledge sharing:
Characteristics and application of the reinforced concrete foundation of Tower suspension
It is a professional enterprise that was engaged in the development, design, production and sales of tower crane in the early days of China.
The main products of the company are tower hanging QTZ80, tower hanging QTZ63(TC5610), tower hanging QTZ40(TC 5008), tower hanging QTZ31 .5, tower hanging QTZ25, tower hanging QTG20A series tower hanging, JZ, JS series concrete mixer, There are dozens of construction machinery products such as PLD series batching machines, WJ80, WJ60 material lifters, etc..
Slewing Trolley Control Panel Box For Tower Crane
Tower Crane Slewing Control Panel Box Invertor
Tower Crane Trolley Control Panel Box Invertor
Tower Crane HF PANEL BOX
The products are sold throughout the country and are exported to many countries and regions abroad.
Tower suspension type reinforced concrete foundation
The construction unit shall review the foundation bearing capacity of the tower crane foundation according to the requirements of the tower crane manual and the geological conditions of the installation site before the tower crane is installed to ensure the safety of the tower crane installation and use.
The bearing capacity of foundation in different areas is very different. Therefore, we must review the bearing capacity of foundation under the concrete foundation of tower crane. When the carrying capacity of foundation does not meet the strength requirements stipulated in the manual, corresponding technical measures such as supplementary pile foundation should be taken to make up for it.
The fixed tower crane of the cross beam foundation can also use a split reinforced concrete foundation. The four corners of the cross beam base of the tower crane are installed on the basis of four reinforced concrete.
Slewing Trolley Control Panel Box For Tower Crane
Tower Crane Slewing Control Panel Box Invertor
Tower Crane Trolley Control Panel Box Invertor
Tower Crane HF PANEL BOX
The size of concrete should be determined by the strength of the foundation under the concrete foundation. Different types of Tower hoists shall determine the side length and height of concrete foundation according to the requirements of the tower hoist usage instructions. Reinforced bars and reinforcing bars in partitioned concrete foundations must be executed using instructions.
If there are special requirements, the construction unit should carry out the strength design and provide specific technical documents to implement the construction.
With heavy science and technology as the background, the high-level corporate culture is integrated into the lives of employees. The ink depicts the people-oriented management concept and the backbone of the real gold forging crane industry.
Slewing Trolley Control Panel Box For Tower Crane
Tower Crane Slewing Control Panel Box Invertor
Tower Crane Trolley Control Panel Box Invertor
Tower Crane HF PANEL BOX