132HC Mast Section Rules for the arrangement of Tower hoists

29-10-2019

Several layout principles for the tower hanging at the construction site:
1. For the sake of Shigongfangbian, the tower crane covers all the construction sites as far as possible. In addition to the selection of the tower crane location, it is also related to the lifting capacity of the tower crane.
2. The location of the tower crane is usually divided into two types: inside or outside the building. The natural foundation or pile foundation is used on the foundation of the building's outer tower, and the tower machine in the building is located on the base plate or load bearing wall body.
3. The tower crane can not interfere with the surrounding buildings. The building can not be removed. When there is interference, it can only choose to replace the tower crane position.
4. Make sure that the attachment distance of the tower crane is reasonable and the structure of the attachment point is stable.

132HC Mast Section 132HC mast section good at  in this field 

Obtenga el último precio? Le responderemos lo antes posible (dentro de las 12 horas)

Política de privacidad